Joseph McGirr Engineer

The Victoria Jubilee Clock was severely damaged after the  Christchurch February 2011 earthquake and required immediate stabilsation under Civil Defense to prevent collapse. Working largely on-site and developing details as they were fabricated a solution based around tensile cross bracing was able to be designed and implemented in a fast effective manner.

Projects